Save this image free of charge in 800 pixels for layout use (right click, Save as...)
|
|
Ref : S07210
Theme :
Space Shuttle - General (1045 images)
Title : Traveling about 1 mph on the crawlertransporter
Caption :
(01/19/2001) -- Traveling about 1 mph on the crawler-transporter, Space Shuttle Atlantis begins the 3.4-mile trek back to the Vehicle Assembly Building. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6
|
|